Skip to main content

    Leadville Trail 100 MTB · Race complete

    Build Your Leadville 100 Fueling Plan

    Personalized carbohydrate, hydration, sodium, caffeine and aid-station strategy built around your expected race time, altitude, race conditions and carrying capacity.

    This race has already run

    Leadville Trail 100 MTB is complete for this edition.

    Build a fueling plan for an upcoming race instead — same personalized strategy, event-specific.

    See upcoming races

    What Leadville does to your fueling

    Most riders show up with a gels-per-hour estimate and hope. A personalized plan replaces guesses with hourly targets, aid-station actions, and contingencies.

    • 10,000+ ft altitude blunts appetite and shifts hydration needs
    • Columbine climb strips carrying capacity right when you need it most
    • Powerline late-race demands caffeine and sodium timing you cannot improvise
    • 8–12 hour race duration exposes every gap in your carbohydrate plan
    • Temperature swings from cold start to hot midday change your sodium needs
    • Aid-station spacing forces contingency planning, not last-minute decisions

    What your plan includes

    Pre-race meal, pre-start timeline, hourly carbohydrate/fluid/sodium targets, aid-station actions, bottle setup, product inventory, GI contingencies and recovery — built around your finish time.

    Race segmentCarbsFluidSodiumExecution
    Start → Twin Lakes (mi 40)80 g/h600 ml/h600 mg/hDrink mix + 2 gels/hr, top off at May Queen
    Columbine out-and-back (mi 40–60)70 g/h700 ml/h700 mg/hHigher fluid on the climb, caffeine gel at Twin Lakes return
    Powerline → finish (mi 80–104)75 g/h600 ml/h550 mg/hCaffeine + easy-to-chew solid, refill at Pipeline

    Illustrative segment strategy — your personalized plan is built around your finish time, sweat rate and product preferences.

    Two ways to race with confidence

    Both build a personalized plan for Leadville Trail 100 MTB. The Race Build Package adds a validation ride and asynchronous reviews so you toe the line with a tested strategy.

    This race has already run

    Leadville Trail 100 MTB is complete for this edition.

    Build a fueling plan for an upcoming race instead — same personalized strategy, event-specific.

    See upcoming races
    FeatureRace Fueling PlanRace Build Package
    Personalized initial plan
    Segment-by-segment strategy
    Aid-station strategy
    Product inventory
    Validation ride protocol
    Structured ride debrief
    One post-ride adjustment
    Final race-week adjustment
    Race Ready final version
    Temporary platform access
    Live consultation

    Reviews are completed asynchronously through FuelQ Pro. Live video consultations are not included.

    Frequently asked questions

    Do I need this if I already have a coach?+

    Yes — the Race Fueling Plan complements your training plan. It focuses only on race-day carbohydrate, hydration, sodium, caffeine and aid-station execution for Leadville.

    How does the plan adapt to my expected finish time?+

    Slower finish times mean more hours on course. The plan recalculates hourly targets and aid-station spacing based on your realistic finish window.

    Can I upgrade to the Race Build Package later?+

    Yes, as long as your race is still at least 14 days away. The Race Build Package is required to complete the validation ride and post-ride review in time.